Edo Government Calls for Citizens’ Participation in Flood Prevention and Waste Management

edo-state

The Edo State Government has restated its commitment to make the state flood-free, clean and green, calling on the citizens of the state to play active roles in preventing flooding and erosion in the face of heavy rains.

Commissioner for Environment and Sustainability, Engr. Jonathan Lawani, who made the statement, said the active participation of citizens in environmental restoration is vital to maintaining a sanitary environment.

He said, “I want to appeal to the people of Edo State on the issue of waste management, cleanliness and erosion control. It must be a joint effort between the government and the citizenry. Whatever affects the state affects everybody that lives in it. People should take care of their immediate environment by clearing grasses and desilting drainages.”

Related News:

Lawani urged residents to stop indiscriminate dumping of refuse, noting: “We have seen that some of our people now put their refuse in their vehicles and dump it by the expressway. This is not good for the state; it makes the city dirty and we have been doing everything possible to clean up.

“We have different waste managers that take care of properties at homes and offices, and are now working together with local governments to make sure people pay for the waste they produce. We also have sweepers’ waste evacuators that are specially assigned to our major roads where our sweepers are cleaning on a daily basis. We have another set assigned to evacuating wastes in the markets.”

He noted that the Ministry is currently evacuating wastes from the various illegal dumpsites especially in Oluku and Ogheghe communities and steps are in place to solve the management issues in these areas permanently.

On flood control, he said preparations have been made to ensure that the effect is not as bad as have been predicted by NiMET, noting, “We deliberately carried out desilting of major drains across Benin City between December up to the month of February. We had to desilt these drains and other minor drains within Benin City.

“We have also constructed ponds in some locations. If we undertake major drain construction on those areas, it’s going to cost billions of naira. What we did was to quickly provide a means of solving that problem without spending too much resources.”

Leave a Reply

Your email address will not be published. Required fields are marked *